old image that depicts 'interpolate domain' instead of 'evaluate on domain' #104674

Closed
opened 2023-12-25 19:48:58 +01:00 by Shmuel Israel · 1 comment

Page Information
File: manual/modeling/geometry_nodes/utilities/field/evaluate_on_domain.rst
Blender Version: 4.0
Documentation Language: en
Permanent Link

Short description of error
The image depicting the node wasn't updated to the new node (name). it still depicts the 'interpolate domain' node (name) instead of 'evaluate on domain' node (name) [which is what it is supposed to be].

**Page Information** File: `manual/modeling/geometry_nodes/utilities/field/evaluate_on_domain.rst` Blender Version: `4.0` Documentation Language: `en` [Permanent Link](https://docs.blender.org/manual/en/4.0/modeling/geometry_nodes/utilities/field/evaluate_on_domain.html) **Short description of error** The image depicting the node wasn't updated to the new node (name). it still depicts the 'interpolate domain' node (name) instead of 'evaluate on domain' node (name) [which is what it is supposed to be].
Shmuel Israel added the
Status
Needs Triage
Priority
Normal
Type
Report
labels 2023-12-25 19:48:58 +01:00
Iliya Katushenock added
Status
Confirmed
and removed
Status
Needs Triage
labels 2023-12-25 20:23:02 +01:00
Blender Bot added
Status
Resolved
and removed
Status
Confirmed
labels 2024-01-02 03:29:07 +01:00
Author

you only replaced 4.1 docs; not 4.0

you only replaced 4.1 docs; not 4.0
Blender Bot added
Status
Needs Triage
and removed
Status
Resolved
labels 2024-01-02 21:06:53 +01:00
Blender Bot added
Status
Resolved
and removed
Status
Needs Triage
labels 2024-01-20 02:15:13 +01:00
Sign in to join this conversation.
No Milestone
No project
No Assignees
1 Participants
Notifications
Due Date
The due date is invalid or out of range. Please use the format 'yyyy-mm-dd'.

No due date set.

Dependencies

No dependencies set.

Reference: blender/blender-manual#104674
No description provided.