Minor Correction #104943

Closed
opened 2024-10-02 18:04:26 +02:00 by Alexandr_Fatih · 0 comments

Page Information
File: manual/modeling/geometry_nodes/geometry/operations/delete_geometry.rst
Blender Version: 4.2
Documentation Language: en
Permanent Link

Short description of error
Extra "S"...

**Page Information** File: `manual/modeling/geometry_nodes/geometry/operations/delete_geometry.rst` Blender Version: `4.2` Documentation Language: `en` [Permanent Link](https://docs.blender.org/manual/en/4.2/modeling/geometry_nodes/geometry/operations/delete_geometry.html) **Short description of error** Extra "S"...
Alexandr_Fatih added the
Type
Report
Status
Needs Triage
Priority
Normal
labels 2024-10-02 18:04:26 +02:00
Blender Bot added
Status
Resolved
and removed
Status
Needs Triage
labels 2024-10-04 04:39:28 +02:00
Aaron Carlisle referenced this issue from a commit 2024-10-04 04:42:05 +02:00
Aaron Carlisle referenced this issue from a commit 2024-10-04 07:23:19 +02:00
Sign in to join this conversation.
No Milestone
No project
No Assignees
1 Participants
Notifications
Due Date
The due date is invalid or out of range. Please use the format 'yyyy-mm-dd'.

No due date set.

Dependencies

No dependencies set.

Reference: blender/blender-manual#104943
No description provided.