Paint "Stroke Methods" doesn't mention use of CTRL+RCLK to draw curves #77034

Closed
opened 2020-05-24 21:38:32 +02:00 by Jeric Chard · 3 comments

In the Paint Editor, the dox for Draw/Stroke Method/Curve don't mention the use of CTRL+RightCLK to initiate drawing of the curve.

The also erroneouslymention the use of CTRL+LeftCLK to add additional control points to a curve, to whit:

**Add Points Ctrl-LMB
You can define additional curve control points by using Ctrl-LMB. The handles can define by dragging the mouse before releasing the mouse button.**

The correct action is CTRL+RCLK, again.

Also missing is the workflow to determine the location of newly created control points on the curve: it's "after" (in curve-creation terms) the selected control point, UNLESSthe user selects the first point, in which case a new 'first' point is created.

In the Paint Editor, the dox for Draw/Stroke Method/Curve don't mention the use of CTRL+RightCLK to initiate drawing of the curve. The also **erroneously**mention the use of CTRL+LeftCLK to add additional control points to a curve, to whit: ``` **Add Points Ctrl-LMB You can define additional curve control points by using Ctrl-LMB. The handles can define by dragging the mouse before releasing the mouse button.** ``` The correct action is CTRL+RCLK, again. Also missing is the workflow to determine the location of newly created control points on the curve: it's "after" (in curve-creation terms) the selected control point, **UNLESS**the user selects the first point, in which case a new 'first' point is created.
Author

Added subscriber: @jeric_synergy

Added subscriber: @jeric_synergy

This issue was referenced by 6690

This issue was referenced by 6690
Member

Changed status from 'Needs Triage' to: 'Resolved'

Changed status from 'Needs Triage' to: 'Resolved'
Aaron Carlisle self-assigned this 2020-05-24 23:17:34 +02:00
Sign in to join this conversation.
No Milestone
No project
No Assignees
3 Participants
Notifications
Due Date
The due date is invalid or out of range. Please use the format 'yyyy-mm-dd'.

No due date set.

Dependencies

No dependencies set.

Reference: blender/blender-manual#77034
No description provided.