[Blender Benchmark 2.81a] Canceling the benchmark does not stop the rendering, still in background task #73017

Closed
opened 2020-01-10 10:57:34 +01:00 by marcuspollio · 3 comments

Hi all !

System Information
Operating system: Linux-5.3.0-3-amd64-x86_64-with-debian-bullseye-sid 64 Bits
Graphics card: Mesa DRI Intel(R) UHD Graphics 630 (Coffeelake 3x8 GT2) Intel Open Source Technology Center 4.5 (Core Profile) Mesa 19.2.6
Desktop Env: Gnome 3.34

Blender Version
Broken: version: 2.81a Linux of the Blender Benchmark Launcher (normal version, non CLI)
Worked: no idea

Short description of error
Canceling the benchmark does not stop the rendering, still in background task

Exact steps for others to reproduce the error
When doing the Benchmark completely, there was no problem.
But when aborting or canceling during the "rendering phase", using the close button of the window, the benchmark continued in background task. I had to cancel it by command-line terminal, or using the System Monitor GUI.

Thanks !

Hi all ! **System Information** Operating system: Linux-5.3.0-3-amd64-x86_64-with-debian-bullseye-sid 64 Bits Graphics card: Mesa DRI Intel(R) UHD Graphics 630 (Coffeelake 3x8 GT2) Intel Open Source Technology Center 4.5 (Core Profile) Mesa 19.2.6 Desktop Env: Gnome 3.34 **Blender Version** Broken: version: 2.81a Linux of the Blender Benchmark Launcher (normal version, non CLI) Worked: no idea **Short description of error** Canceling the benchmark does not stop the rendering, still in background task **Exact steps for others to reproduce the error** When doing the Benchmark completely, there was no problem. But when aborting or canceling during the "rendering phase", using the close button of the window, the benchmark continued in background task. I had to cancel it by command-line terminal, or using the System Monitor GUI. Thanks !
Author

Added subscribers: @marcuspollio, @SemMulder

Added subscribers: @marcuspollio, @SemMulder
Author

Changed status from 'Needs Triage' to: 'Resolved'

Changed status from 'Needs Triage' to: 'Resolved'
marcuspollio self-assigned this 2020-01-13 11:32:44 +01:00
Author

With the newest version of the Launcher, after work being done by @SemMulder, the error is gone.
Thanks !

Feel free to reopen if the described error reappears.

With the newest version of the Launcher, after work being done by @SemMulder, the error is gone. Thanks ! Feel free to reopen if the described error reappears.
marcuspollio removed their assignment 2020-01-13 11:33:07 +01:00
Sign in to join this conversation.
No Milestone
No project
No Assignees
1 Participants
Notifications
Due Date
The due date is invalid or out of range. Please use the format 'yyyy-mm-dd'.

No due date set.

Dependencies

No dependencies set.

Reference: infrastructure/blender-open-data#73017
No description provided.